Clutch Case #028
Warehouse Bridge Location: Dallas, TX
Industry: Manufacturing
Industry: Manufacturing
In preparation for the summer heat, our team worked with a warehouse facility to design a temporary cooling setup that would keep operations running smoothly through the hottest months of the year. Maintaining the right temperature was crucial to protecting both workers and inventory, so we engineered a solution that balanced power, efficiency, and organization.
We installed high-capacity air-conditioning packaged units along with a custom-built wooden bridge to support and organize the ductwork efficiently. This setup ensured optimal airflow across the production floor while minimizing clutter and obstructions. The result was a reliable, well-structured cooling system that kept production on pace all season long.
Equipment AC Packaged Units (Qty. 2) 60 Tons
Mining Cable 4/0 x 50 ft
Duct 20" x 25 ft Duct Organization Bridge
Next Up...
Regardless of the scope or size of your project, we deliver the same unfaltering commitment, hustle and get-it-done-yesterday urgency to every project. Connect directly with an experienced HVAC professional who takes ownership of your issue and finds a solution – even when it goes beyond just rental equipment. One call, one team, and we’ll find a way to get it done.