Clutch Case #027
College Outage Location: Georgetown, TX
Industry: Disaster Relief
Industry: Disaster Relief
When a powerful storm left a university campus without power and cooling, our team responded immediately to help restore critical building operations. With classes, research facilities, and residence halls impacted, getting a dependable temporary system in place was essential to maintaining safety and comfort for students and staff.
We quickly delivered and installed a 270-ton air-cooled chiller to handle the chilled water load until permanent systems could be brought back online. The setup provided steady, reliable cooling across the affected buildings, minimizing disruption and allowing the university to maintain operations while recovery efforts were underway.
Equipment Air-Cooled Chiller 270 Ton
Next Up...
Regardless of the scope or size of your project, we deliver the same unfaltering commitment, hustle and get-it-done-yesterday urgency to every project. Connect directly with an experienced HVAC professional who takes ownership of your issue and finds a solution – even when it goes beyond just rental equipment. One call, one team, and we’ll find a way to get it done.