Clutch Case #025
Tent Transformer Location: Dallas, TX
Industry: Disaster Relief
Industry: Disaster Relief
When severe weather caused unexpected damage that left a facility without climate control, our team stepped in to provide a complete temporary HVAC solution. With both structural repairs and restoration work underway, maintaining proper temperature and humidity levels was essential to protecting materials and ensuring safe working conditions. Our crew worked through the weekend to deliver and install a system capable of providing cooling, heating, and dehumidification—all in one setup.
Once the site was cleared and ready for equipment, we installed a 25-ton 480/3 powered unit with a transformer connected to the existing house power. The system was designed to fit within the temporary reconstruction tent, providing reliable climate control throughout the recovery process. The solution kept progress on track, prevented moisture-related delays, and supported a faster, safer return to normal operations.
Equipment Powered Unit with Transformer
25 ACHDC 480/3
Next Up...
Regardless of the scope or size of your project, we deliver the same unfaltering commitment, hustle and get-it-done-yesterday urgency to every project. Connect directly with an experienced HVAC professional who takes ownership of your issue and finds a solution – even when it goes beyond just rental equipment. One call, one team, and we’ll find a way to get it done.