Clutch Case #021
Drywall Climatize Location: Plano, TX
Industry: New Construction
Industry: New Construction
When a hospital construction project required precise climate control across four floors during the drywall phase, our team was brought in to deliver fast and dependable results. Moisture control and air tempering were critical to keeping materials in optimal condition and ensuring progress stayed on schedule. In just two days, we installed two 120-ton, 15k air handlers with 5” static pressure, paired with a 270-ton air-cooled chiller and generator package.
To support continuous operation, we also managed on-site fueling for the duration of the project—providing a complete, turnkey solution. The system delivered consistent, dry air throughout the space, allowing contractors to maintain quality standards and finish work efficiently. The result was a controlled environment, a steady construction timeline, and a satisfied customer.
Equipment Air Handlers (Qty. 2) 120 Ton with 15k
Air-Cooled Chiller 270 Ton
Next Up...
Regardless of the scope or size of your project, we deliver the same unfaltering commitment, hustle and get-it-done-yesterday urgency to every project. Connect directly with an experienced HVAC professional who takes ownership of your issue and finds a solution – even when it goes beyond just rental equipment. One call, one team, and we’ll find a way to get it done.