Clutch Case #015
Data Center Towers Location: Richardson, TX
Industry: Data Centers
Industry: Data Centers
When a data center scheduled a pump relocation project, maintaining precise temperature control throughout the process was critical to preventing costly downtime. Our team partnered with the facility’s operations staff to design a temporary cooling plan that would keep systems running at peak performance while the permanent equipment was offline.
We delivered and installed a 300-ton cooling tower, heat exchanger, and pump to provide consistent, reliable cooling coverage during the work. This supplemental setup ensured stable building load management and uninterrupted data processing, allowing the project to move forward safely and efficiently without any operational interruptions.
Equipment Cooling Tower 300 Ton
Next Up...
Regardless of the scope or size of your project, we deliver the same unfaltering commitment, hustle and get-it-done-yesterday urgency to every project. Connect directly with an experienced HVAC professional who takes ownership of your issue and finds a solution – even when it goes beyond just rental equipment. One call, one team, and we’ll find a way to get it done.